64 machines±0.01 mm standard tolerance1 pc to 50,000 pcsDrawing review in 48 h Send a drawing
//How we control quality
  1. 01Drawing Reviewtolerances checked before quoting
  2. 02First Articlefull FAI report on part one
  3. 03In-Process SPCcritical dimensions charted live
  4. 04CMM Final Checkevery lot measured
  5. 05DocumentationCMM, material and PPAP pack
CMM probe measuring a stainless flange
Inside our inspection lab
//Certified
  • ISO 9001:2015
  • PPAP Level 3
  • EN 10204 3.1
  • RoHS · REACH
Quality ManualOn request · PDF Typical CMM ReportOn request · PDF
< 50 PPM defect rate100% lot inspectionReports shipped with every order
Machined flanges packed in an export crate
Packed, documented and shipped to 31 countries.
//Timeline
  1. 1995Founded with 2 lathes
  2. 2008First export order, Germany
  3. 20165-axis cell commissioned
  4. 202664 machines, 31 countries
Sales desk +91 22 4000 1995 sales@quillandspindle.com Mon – Sat · 9:00 – 19:00 IST Book a call

//Quality

Measured. Recorded. Shipped with proof

Every lot is measured on the CMM, every bar traced to its mill, and every report ships with the parts.

CMM probe measuring a flange
  • CertifiedISO 9001:2015
  • Defects< 50 PPM

//07 Quality

Measured. Recorded. Shipped with proof

142.088.535.018.0 Ø250.0M24 × 2.0 6 × Ø11.0 EQUISPACEDON PCD 184.0 Ø120.0 Ø0.01A A MATERIALSS 316L PART NO.QS-S-2087 REV.C SCALE1:2
01First Article Inspection

every new part, full dimensional report

02In-Process SPC

critical dims charted every 25 pcs

03CMM Final Inspection

Zeiss-class CMM, 100% of lots

04Traceability

heat number to invoice, 10-year records

  • ISO 9001:2015
  • PPAP Level 3
  • EN 10204 3.1
  • RoHS · REACH

//Quality in numbers

The numbers our customers audit

  • < 50PPM

    rolling 12-month defect rate

  • 100%Lots inspected

    on the CMM before dispatch

  • 10Years

    records kept per heat number

  • 48 hDFM review

    on every new drawing

//Material assurance

Steel bars with heat tags

Every bar traced to its mill

We buy from approved mills only and keep the EN 10204 3.1 certificate for every heat. Stainless, alloy and carbon steel, aluminium, brass, bronze, titanium and engineering plastics.

  • StainlessSS 304 · 316L · 410 · 17-4PH
  • Alloy steelEN8 · EN19 · EN24 · 4140
  • Aluminium6061-T6 · 6082 · 7075-T6
  • Brass & titaniumCW614N · C360 · Ti Grade 2 / 5
Ask about your grade

//Export

Shipping to 31 countries. Every week

Documentation, packing and logistics handled end to end.

DestinationPortTransitLast shippedStatus
GERMANY HAMBURG 24 DAYS 21 OCT ON TIME
USA HOUSTON 32 DAYS 18 OCT ON TIME
UAE JEBEL ALI 6 DAYS 23 OCT LOADING
ITALY GENOA 22 DAYS 15 OCT ON TIME
JAPAN YOKOHAMA 19 DAYS 12 OCT ON TIME
UK FELIXSTOWE 26 DAYS 20 OCT ON TIME
IncotermsFOB · CIF · DAP · DDP
DocumentsCOO · Packing list · Material certs
PackingVCI + ISPM-15 crates
LanguagesEN · DE · ES · AR
Export & logistics

//09 How it works

Drawing in. Parts out. Five steps

  1. Day 0Send drawingSTEP, DWG or PDF
  2. Day 2Quote + DFM notesengineer reviewed
  3. Day 9First article / FAIwith full report
  4. Day 21ProductionSPC monitored
  5. Day 24Shipinspected and documented

Send your drawing

A real engineer replies within 48 hours — not a bot.

  • NDA on request
  • Your files are encrypted
  • No minimum order
Printed drawing with vernier caliper and machined part

We use your details only to respond to this enquiry, for business purposes. We never share your data.