64 machines±0.01 mm standard tolerance1 pc to 50,000 pcsDrawing review in 48 h Send a drawing
//How we control quality
  1. 01Drawing Reviewtolerances checked before quoting
  2. 02First Articlefull FAI report on part one
  3. 03In-Process SPCcritical dimensions charted live
  4. 04CMM Final Checkevery lot measured
  5. 05DocumentationCMM, material and PPAP pack
CMM probe measuring a stainless flange
Inside our inspection lab
//Certified
  • ISO 9001:2015
  • PPAP Level 3
  • EN 10204 3.1
  • RoHS · REACH
Quality ManualOn request · PDF Typical CMM ReportOn request · PDF
< 50 PPM defect rate100% lot inspectionReports shipped with every order
Machined flanges packed in an export crate
Packed, documented and shipped to 31 countries.
//Timeline
  1. 1995Founded with 2 lathes
  2. 2008First export order, Germany
  3. 20165-axis cell commissioned
  4. 202664 machines, 31 countries
Sales desk +91 22 4000 1995 sales@quillandspindle.com Mon – Sat · 9:00 – 19:00 IST Book a call

//Industries

Six industries. One standard

The parts change; the tolerance, documentation and delivery do not.

Hydraulic manifold
  • Industries6
  • Countries31

//Choose your industry

Cut-away valve body and pump impeller
Typical parts

Valve bodies · Shafts · Impellers · Seats

Tolerance

±0.01 mm

Supplying pump and valve OEMs in Germany and Italy since 2008.

Pumps & Valves parts

//Case study

Valve body and impeller

How a German pump OEM cut its supplier count from 4 to 1

Shafts, impellers, seal glands, flanges, wear rings and fasteners came from four suppliers in three countries. We took over all six part families, set up kanban stock in Hamburg and held a 21-day door-to-door lead time.

  • 6part families consolidated
  • 21 daysdoor-to-door lead time
  • 0line stoppages since switching
Talk to the engineer who ran it

//04 Catalogue

144 standard parts, ready to quote

QS-M-3001

Gearbox Housing

Al 6061-T6 · ±0.02 mm · 180 × 120 × 90 mm
QS-G-5001

Chrome Piston Rod

CK45 hard chrome · ±0.005 mm · Ø25 f7 × 400 mm
Showing 8 of 144Browse all 144 parts

//09 How it works

Drawing in. Parts out. Five steps

  1. Day 0Send drawingSTEP, DWG or PDF
  2. Day 2Quote + DFM notesengineer reviewed
  3. Day 9First article / FAIwith full report
  4. Day 21ProductionSPC monitored
  5. Day 24Shipinspected and documented

Send your drawing

A real engineer replies within 48 hours — not a bot.

  • NDA on request
  • Your files are encrypted
  • No minimum order
Printed drawing with vernier caliper and machined part

We use your details only to respond to this enquiry, for business purposes. We never share your data.